  • New! Reinforcement work to the Bearspaw South Feeder Main is underway. City-wide water restrictions are in effect and indoor water conservation is needed. Learn more.

2026 Bearspaw South Feeder Main reinforcements

Utilities Delivery 2026 Bearspaw South Feeder Main reinforcements

Due to the critical condition of the Bearspaw South Feeder Main (BSFM) and its importance in Calgary’s drinking water system, we are reinforcing sections of the pipe that are in the most vulnerable condition, to stabilize them and reduce the chances of a break.  This work will support the BSFM to continue safely delivering our drinking water until the new parallel steel pipe is completed and can take over service from the current line.  

Construction began on March 9, 2026, and is expected to last approximately four weeks taking place for six segments of pipe along 16 Avenue N.W., near Sarcee Trail and three segments in Point McKay Park. 

Reinforcement construction updates

Updated April 1, 2026

Current project status

  • Reinforcement construction is now complete.
  • Remaining surface works, including paving are now underway.

Road closures and detours

  • Lane reductions are in place on 16 Avenue N.W. near the Sarcee Trail interchange, with one lane open in each direction.
  • The exit ramp from 16 Avenue N.W. onto Sarcee Trail and the exit off Sarcee Trail onto westbound 16 Avenue N.W. are both closed.
  • 16 Avenue westbound remains open but changed lane patterns will cause traffic to move slowly.
  • Drivers heading west on 16 Avenue N.W. are encouraged to plan ahead.

Contact

If you have questions or feedback about the project, we’d like to hear from you.

Reinforcement milestones

We will repair the identified pipe segments using a concrete reinforcement technique. This approach involves exposing the pipe through excavation, constructing an exterior reinforcing steel cage, pouring concrete around the existing pipe, and backfilling. The construction method is subject to change once the pipe is exposed.

past-item

Category Icon and Label

Step 1 Stage 4 water restrictions begin

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 2 Drain feeder main

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 3 Excavate

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 4 Encase pipe in concrete

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 5 Concrete curing

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 6 Concrete form removal

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 7 Backfill and pave

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 8 Fill feeder main

Start Date | End Date

Complete

past-item

Category Icon and Label

Step 9 Water quality testing

Start Date | End Date

Complete

current-item

Category Icon and Label

Step 10 Stabilize system

Start Date | End Date

In progress

Image gallery

Where we are working

Construction Details

Bearspaw South Feeder Main Reinforcements

  • Work area 1: Closure beginning Saturday, March 7, on the westbound exit off Sarcee Trail onto 16 Avenue N.W.   
  • Work area 2: Currently closed - the right lane of westbound 16 Avenue N.W., onto the Sarcee Trail exit.  
  • Work area 3: Point Mckay Park. All reinforcement sites will fall within the existing park closures.   
  • Construction storage area: North of 16 Avenue N.W., at 4304 17 Avenue N.W.   

Risk of another break remains

The City cannot guarantee that the pipe will not break unexpectedly again before or after the reinforcement work takes place. If another break occurs before the planned reinforcements, crews will move immediately to complete portions of the reinforcement work at the same time as the break repair. Preparations are underway to allow crews to mobilize as quickly as possible if this occurs. 

We understand that these reinforcements will have impacts on the community with construction happening 24/7 during this time. We are working with those directly impacted and more information on construction will continued to be shared with the area.

Impacted communities

Residents and businesses in Bowness, Montgomery and Parkdale, along the feeder main alignment, should anticipate more mail drop updates, construction notices and info sessions. Residents and businesses that have not already done so, can sign up to receive email updates.

Residents or businesses with questions regarding this project, please email us directly

Water restrictions

Restrictions in effect starting March 9

The feeder main will be taken out of service to complete construction. During this time it’s critical that all Calgarians and the surrounding regions use less water. Outdoor water restrictions and indoor water conservation will be in effect starting March 9. No outdoor water use will be permitted during this time.

We’re asking all Calgarians to save 25-30 litres of water per day indoors by taking the following actions:

  • Keep showers short, three minutes or less.
  • Flush toilets only when necessary.
  • Only run dishwashers and washing machines when there is a full load.
Learn more about water restrictions