Bylaw test
Top of page
PART 8: INDUSTRIAL DISTRICTS
Division 2: Industrial – General (I-G) District
Permitted Uses
2
Unless otherwise referenced in subsection 908(1), the following uses are permitted uses in the Industrial — General District:
Discretionary Uses
3
The following uses are discretionary uses in the Industrial — General (I-G) District on a parcel with a Cannabis Facility:
Building Size
910
The maximum gross floor area of all buildings on a parcel that is not serviced by City water and sewer, is 1600.0 square metres.
Use Area
910.1
1
The maximum public area for a Restaurant: Food Service Only or Restaurant: Licensed is 300.0 square metres.
Floor Area Ratio
911
The maximum floor area ratio for buildings on a parcel that is serviced by City water and sewer is 1.0.
912
1
Unless otherwise referenced in subsection (2), there is no maximum building height for a building located on a parcel in the Industrial – General District.
2
Where the parcel shares a property line with a parcel in the S-SPR District or a residential district, the maximum building height is 18.0 metres.
Building Setback
913
The minimum building setback from a property line shared with the Headworks Canal operated by the Western Irrigation District is 15.0 metres.
Storage of Goods, Materials and Supplies
913.1
1
A use may have an outdoor area for the storage of goods, materials or supplies provided the storage area is:
2
Goods, materials or supplies stored outside of a building within 5.0 metres of a property line have a maximum height of 5.0 metres.
3
The height of goods, materials or supplies is measured from grade and includes any pallets, supports or other things on which the goods, materials or supplies are stacked.
Screening
b
a street or lane where the street or lane separates the parcel from a residential district or special purpose district.
914.1
1
Unless otherwise referenced in subsection (2), the cumulative gross floor area of Office uses in a building must not exceed 50.0 per cent of the gross floor area of the building.
3
The Development Authority may consider a relaxation of subsection (1) where an Office is proposed in a building:
b
where the floor area proposed for the Office has already been constructed to accommodate an administrative or office function.
Front Setback Area
915
Where the parcel shares a front property line with:
a
an expressway or major street, the front setback area must have a minimum depth of 6.0 metres; and
b
any street, other than an expressway or major street, the front setback area must have a minimum depth of 4.0 metres.
Rear Setback Area
ii
in the case where walls facing the rear property line are constructed of materials that do not require maintenance, there is no requirement for a rear setback area; or
iii
in the case where the parcel is adjacent to a rail line that terminates and there is no need for a spur line or the spur line is incorporated within the building, there is no requirement for a rear setback area;
b
the Headworks Canal operated by the Western Irrigation District, the rear setback area must have a minimum depth of 7.5 metres;
d
an LRT corridor or street, not including an expressway or major street, the rear setback area must have a minimum depth of 4.0 metres.
Side Setback Area
ii
in the case where walls facing the side property line are constructed of materials that do not require maintenance, there is no requirement for a side setback area; or
iii
in the case where the parcel is adjacent to a rail line that terminates and there is no need for a spur line or the spur line is incorporated within the building, there is no requirement for a side setback area;
b
the Headworks Canal operated by the Western Irrigation District, the side setback area must have a minimum depth of 7.5 metres;
d
an LRT corridor or street, not including an expressway or major street, the side setback area must have a minimum depth of 4.0 metres.
Landscaping In Setback Areas
918
1
Where a setback area shares a property line with a street, expressway or major street, the setback area must:
2
Where a setback area shares a property line with a lane, there is no requirement for a soft surfaced landscaped area or hard surfaced landscaped area.
3
Where a setback area shares a property line with a parcel designated as a residential district, the setback area must:
4
Where a setback area shares a property line with an LRT corridor, or parcel designated as a commercial, industrial or special purpose district, the setback area:
5
Where a setback area shares a property line with the Headworks Canal operated by the Western Irrigation District, the setback area must:
Additional Landscaping Requirements
919
1
Unless otherwise referenced in this District, all setback areas on a parcel, not including those portions specifically required for motor vehicle access, sidewalks, or any other purpose allowed by the Development Authority, must be a soft surfaced landscaped area.
2
Every building on a parcel must have at least one sidewalk connecting the public entrance to a public sidewalk, or in the case where there is no public sidewalk, to the nearest street.
4
Every sidewalk located along the front of a building and every sidewalk located within a setback area must be:
Employee Area
920
All developments must have an outdoor area, for use of the employees, that is a minimum of 10.0 square metres.