Following the lifting of water restrictions, pools and arenas continue to be open. Showers at arenas, athletic parks and the Calgary Soccer Centre have reopened. Hot tubs and steam rooms will begin to reopen the week of Sept. 23 but will take several days to prepare.
Our dive tank is a chlorine pool that is 3.65 meters (12 feet) deep with a 1-meter high springboard diving board. Our chlorine dive tank has an average water temperature of 28.5 degrees Celsius.
The dive tank is also home to a 70 meter (230 foot) long slide.
Information
|Upcoming preventative maintenance and cleaning
Village Square Leisure Centre will be closed beginning Sept. 3 for annual preventative maintenance and cleaning.
Weight room will reopen Sept. 7
Fitness centre and multipurpose rooms will reopen Sept. 9
Pool and steam room will remain closed until early October