Auburn Bay - Mobility safety improvements
In the summer of 2024, temporary traffic calming measures will be put in place to improve safety along two corridors: Auburn Shores Way S.E. and Auburn Sound Manor S.E. These safety improvements are being considered in response to findings from a recent safety and operational review looking at operational speed and collisions in the area. The changes are expected to reduce incidents and near-misses involving pedestrians, cyclists, and motorists.
Preliminary inputs for the proposed changes were gathered from the recent Community Speed Watch, Ward 12 councillor’s office and 311 feedback from the citizens living in the community of Auburn Bay.
Proposed changes include:
- Installation of temporary curb extensions along the two corridors to ensure that these corridors operate as one lane each direction.
- Median extensions.
- Crosswalk enhancements.
- Painting shoulder lines along the corridors to reduce travel lane width.
- Installing temporary speed humps in select locations.
Project timeline
- June 2024: Online engagement to solicit resident feedback on draft plans
- July 2024: Finalize the design
- July-August 2024: Temporary installations
Concept plans
Download the draft Auburn Shores Way S.E. Concept Plans and Auburn Sound Manor S.E. Concept Plans from the engagement meetings.
Auburn Shores Way S.E.
Auburn Sound Manor S.E.
Provide your feedback
Contact us by filling out the online service request below or call 311 for assistance.
What we heard report - September 2024