Ramsay/Inglewood
Rendering of Ramsay/Inglewood Station head.
About the station
Ramsay/Inglewood Station will be built between the communities of Ramsay and Inglewood and connects to:
- 9 Avenue and the Inglewood Business Improvement Area (BIA)
- 11/12 Street S.E. Ramsay business district
- Calgary Zoo
- Elbow River pathway
- Riverwalk
Green Line worked with the community and developers to create the Inglewood/Ramsay/26 Avenue S.E. Transit Oriented Development Concept Plan in 2015. Highlights include a pedestrian-friendly retail shopping street on 11 Street S.E. similar to 9 Avenue S.E.
Features of station area
![Map of Ramsay/Inglewood station features.](/content/www/en/home/green-line/stations/ramsay-inglewood/_jcr_content/root/upperPar/responsivegrid/grid_layout_copy_135_295175000/column-9cf5e450-523e-4cd8-aa00-3e0e9e04dbd10/gl_edge_to_edge_wrap/responsivegridA/grid_layout/column-262f9d27-68ac-4ea5-96f5-8282413a09490/gl2_media/image.img.jpg)
- Multi-use pathway
- Station
- Passenger pick-up/drop-off
- Plaza/event space
- Station head
Key features:
- Design to minimize physical barriers and promote clear sightlines
- Aligns with current and future multi-use pathways
- Proximity to residential and commercial buildings, along with neighbouring breweries
- An integrated, user-friendly urban environment
- Designated passenger pick-up and drop-off area
- Shared plaza space between bus drop-offs and station platform
- Event space for community programming
- Shared amenities within the transit platform, bus waiting area and pedestrian corridors
- Partial canopy coverage on platforms
- Platform shelters
- Seating and lean rails for passenger comfort
- Bicycle parking
Current construction
Eau Claire Market and River Run Condos demolitions
Site set-up, hazardous material abatement and demolition will be completed at Eau Claire Market by June 2025.
![](/content/dam/www/green-line/publishingimages/2-0/green-line-bdrup-main-4-3.jpg)
Beltline Downtown Utility Relocation Project (Third-party Shallow Utilities)
The Beltline Downtown Utility Relocation Project will relocate underground, street-level and overhead utilities.
![](/content/dam/www/green-line/publishingimages/2-0/green-line-78-ave-16-9.jpg)
78 Avenue Project
A pedestrian tunnel will be constructed near 72 Avenue S.E., a vehicle tunnel will be built at 78 Avenue S.E., and a portion of 78 Avenue S.E. will be upgraded.
![](/content/dam/www/green-line/publishingimages/2-0/north-central-brt.jpg)
North Central Bus Rapid Transit (BRT) improvements
While planning continues to bring future Green Line LRT service to the north, immediate improvements to the Bus Rapid Transit (BRT) corridor on Centre Street are underway.
Community events and information
Green Line will be in your community! Catch-up with us at:
Inglewood Sunfest
When: July 24, 2024
Time: 11 am - 7 pm
Location: 9 Avenue S.E.
Sign up for our newsletter and find out where we will be next.
![Green Line Street Team at an event with swag, information and games.](/content/www/en/home/green-line/stations/ramsay-inglewood/_jcr_content/root/upperPar/responsivegrid/grid_layout_copy_135_577180863/column-9cf5e450-523e-4cd8-aa00-3e0e9e04dbd10/gl_edge_to_edge_wrap/responsivegridA/grid_layout/column-262f9d27-68ac-4ea5-96f5-8282413a09490/grid_layout_copy_189/column-70d09bfb-4a5f-4be4-ba5a-f803755967000/gl2_media/image.img.jpg)